WORKS TO RELOCATE THE SEA OUTLET OF THE CAMBERENE STATION:

The Cambérène Emissary project is essentially a sanitation project
consisting of:

  • Pumping Station: The Camberene Pumping Station is designed to collect and pump treated wastewater from the Camberene WWTP. The special feature of the station is the depth of its excavation bottom (9m), hence the need to use 16m long sheet piles as a shielding curtain for the excavations.
  • Laying the Discharge Pipe: The discharge pipe is made of GRP DN 1300 and DN 1400 over a length of 5,200 m
20190617_142528

SANITATION OF CITE SOLEIL AND ITS SURROUNDING AREA

The Cité Soleil 706 project is a sanitation project in the commune of Dalifort, it is essentially made up of one part:

  • Wastewater : the Wastewater part is the most substantial of the works, it consists of the installation of 30 km of PVC pipe network (DN 250, DN315 and DN 400), in the prefabrication and installation of 1500 inspection chambers.
  • Rainwater : the Rainwater Network is made of reinforced concrete culverts of different sections depending on the flow to be evacuated (50×50, 60×60, 80×80, 100×100) part of the rainwater network is made of PVC pipe.
  • Paved road : The city road is made of 8 cm thick paving stones on a 0/31.5 all-in foundation layer, 62,000 m2 of self-locking paving stones were laid on this project.
  • Pumping station : Two pumping stations were built on this project as well as their equipment.